秋葵视频安卓app在线下载

Welcome to Dongguan Maolong Machinery Equipment Co., Ltd.!
common problem
What is the startup and shutdown sequence of hot melt adhesive gluing machine
浏览次数: Time: 2019-10-22Views :
The first step is to turn on the power switch, the second step is to turn on the heater switch, and the third step is to adjust the temperature controller of the reservoir (the second from the left) to 130-150 degrees (press the SET button below the controller switch) Start the adjustment. If the temperature needs to rise, press the up button. If the temperature needs to decrease, press the down button. After setting the desired temperature, press the SET button again. The temperature adjustment is complete. The fourth step is to adjust the rubber roller.
Hot melt glue gluing machine startup sequence:
Step 1: Turn on the power switch;
Step 2: Turn on the heater switch;
Step 3: Adjust the temperature controller of the storage tank (the second from the left) to 130-150 degrees (press the SET button below the controller switch to start the adjustment. If the temperature needs to rise, press the upward arrow, if the temperature needs to decrease Press the down arrow to set the required temperature, and then press the SET key again to complete the temperature adjustment);
Step 4: Adjust the rubber roller temperature controller (the first on the left) to 100-120 degrees (the adjustment method is the same as that of the rubber tank temperature controller), so that it can start preheating;
Step 5: After the hot melt in the glue tank has been preheated, the motor start indicator (the third indicator on the left of the left motor start switch has an indicator) will be on. When it is on, you can turn on the motor. Power switch (a black switch), the speed of the motor can be adjusted according to the required working speed. That's OK.


Hot melt glue gluing machine sequence:
Step 1: Turn off the heater switch first to reduce the temperature of the rubber roller and the storage tank to prevent charring of the hot melt adhesive on the rubber roller.
Step 2: When the heater switch is turned off for 5-10 minutes after the temperature decreases, you can adjust the motor speed adjustment button to zero, and then turn off the motor power switch.
Step 3: Close the device power switch at the end to complete the shutdown procedure.

For more information, please call the customer service hotline: 13929921558


Copyright ? 2016-2019 Dongguan Maolong Machinery Manufacturing Co., Ltd. All rights reserved

Guangdong ICP No. 10227467